Rules for editing main and sub-tender titles in the BoQ of bids, cost sheets, quotations and contracts

Main and sub-tender titles in the BoQ lock as soon as other records depend on them, so cost centers and cost sheet materials stay tied to the real work items. This article explains when a title can be edited in each record and when it locks, and the new check when choosing a quotation on a contract.

Required permissionsEdit permission on the record (bids, cost sheets, construction quotations, contracts)
How to get thereConstruction → Bids / Cost Sheets / Construction Quotations / Contracts → Edit → BoQ

Why do titles lock?

  • Contract cost centers and cost sheet materials are built on the BoQ items; renaming an item after linking detaches those records from the real item.
  • So a title locks once the record is linked to a record that relies on its BoQ.
  • The rule covers main tender and sub-tender titles.
  • A cost sheet locks as soon as its quotation is linked to any contract, even a draft one.
  • Only renaming or removing a saved tender is blocked; you can still add new main tenders or sub-tenders to a locked BoQ.
  • These rules cover titles only; an approved construction quotation cannot be edited at all.

When does the title lock in each record?

  • On a contract the title locks when a cost sheet is linked, even while creating the contract, because the BoQ comes from the cost sheet.
  • Without a linked cost sheet, contract titles stay editable as long as the contract is not Active.
Record Main and sub-tender titles editable Locked when
Bid As long as no cost sheet or quotation is linked A cost sheet or quotation is linked
Cost sheet On its own or with a linked quotation It is linked to a contract
Construction quotation When not linked to a cost sheet It is linked to a cost sheet
Contract Without a linked cost sheet, unless the contract is active A cost sheet is linked (even during creation), or the contract becomes active

Cost sheet check when choosing a quotation on a contract

  • When an Approved quotation is chosen on the contract form, the system now also checks the cost sheet linked to it.
  • If that cost sheet is not Approved, the validation message “The linked cost sheet must be approved” appears under the Quotation field with the cost sheet number as a link so you can open and approve it.
  • This matches the existing behaviour when an unapproved quotation is chosen.

What to do when a locked title must change

Situation Fix
The bid has a linked cost sheet or quotation. Edit the title in the cost sheet or quotation if editable, or clone.
The cost sheet is linked to a contract. The title cannot change; the contract and its cost centers rely on it.
The quotation is linked to a cost sheet. Edit the title in the cost sheet, then approve it again to update the quotation.
The contract has a linked cost sheet or became active. It cannot be edited.

If a change or removal of a locked title reaches saving, the system rejects it with a message per record:

Record Message
Bid “You cannot rename or remove tenders or sub-tenders after a construction quotation or cost sheet has been linked to the bid.”
Cost sheet “You cannot rename or remove tenders or sub-tenders of a cost sheet linked to a contract.”
Construction quotation “You cannot rename or remove tenders or sub-tenders of a quotation linked to a cost sheet.”
Active contract “You cannot rename or remove tenders or sub-tenders of an active contract.”
Contract linked to a cost sheet “You cannot rename or remove tenders or sub-tenders of a contract linked to a cost sheet.”
🛈

Note: A locked title cell looks disabled (grey) and does not open for typing when clicked, while work items and materials under it can still be selected.

Frequently asked questions

Why can't I edit a main tender title in the bid?

Because a cost sheet or quotation is linked to the bid.

Can titles of a cost sheet linked to a quotation be edited?

Yes, unless the sheet is linked to a contract.

Why are titles locked on a new unsaved contract?

Because it has a linked cost sheet, so titles lock even during creation.

Why did a message ask to approve the cost sheet when I chose an approved quotation on the contract?

Because the cost sheet linked to the quotation is not approved; open it from the link and approve it.

Does the lock cover work items and materials?

The rule is about main and sub-tender titles, and new main or sub-tenders can still be added after the lock.