The contract BoQ is replaced by the chosen quotation's BoQ, and anything entered by hand in the contract BoQ is lost. That is why an info icon (ⓘ) shows next to the Quotation field label; hovering it shows the hint: By selecting a quotation the contract BoQ will be replaced.
- Choose the quotation first, then edit the BoQ if needed.
- The hint icon is not shown when the field is disabled, e.g. on an active contract, because the quotation can no longer change.
- The BoQ is replaced as soon as the quotation is chosen, with no confirmation, and the main tender titles that come from the cost sheet become locked.
- If you choose None, the manual BoQ stays as it is.
- The quotation and its linked cost sheet must both be approved; if the cost sheet is not approved, the message “The linked cost sheet must be approved” appears under the field with the cost sheet number as a link.