Adding and Editing a Construction Quotation
This feature allows the system user to create a construction quotation directly without necessarily linking it to a bid or project, to enter data quickly into the system, in addition to editing existing quotations.
Before You Begin
- To Add: you must have the “Add Construction Quotations” permission to be able to create a construction quotation.
- To Edit: you must have the “Edit & Delete All Construction Quotations” permission or the “Edit & Delete His Own (Created) Construction Quotations” permission to be able to edit a construction quotation.
Steps to Add a Construction Quotation
- From the sidebar menu, click on “Construction,” then go to “Construction Quotations.”
- Click the “Create Construction Quotation” button.
- Fill in the quotation’s data.
- Click “Save” to save it with the status “Issued.”
Steps to Edit a Construction Quotation
- From the construction quotations list, open the required quotation.
- Click the “Edit” button.
- Edit the required data, then save the changes.
Construction Quotation Data
“Construction Quotation Information” section:
- Construction Quotation Number (required): generated automatically, and can be edited manually.
- Link Construction Quotation to (optional): select the entity type (bid or project), then select the entity itself to link it.
- Client (required): select the client from the dropdown list, or click “+ Add New Client” to create a new client directly from the same screen.
- Cost Sheet (required): select the cost sheet linked to the quotation.
- Currency (required): select the currency.
- Tax 1 / Tax 2 (optional): select the tax, or leave the value as “Specify Per Work Item.”
- Duration (optional): enter the duration, and select its unit (months or days).
- Start Date / End Date (optional): specify both dates.
- Description (optional): enter a description for the quotation.
- Attachments (optional): upload files via drag and drop or by selecting from the device (PNG, JPEG, GIF, BMP, RAR, PDF, up to 25 MB per file).
“Bill of Quantities” section:
- Click the “Full Screen” button to view the table in a larger view.
- Enter the main item’s name in the “Item” column, use the drag icon (⠿) to reorder it, or the [+] button to add a subtender or work item beneath it.
- Enter each item’s data: Quantity, Sale Rate, Tax 1, and Tax 2; the Subtotal is calculated automatically.
- Monitor the “Total” row in the table footer, which updates automatically with every edit.
- Click the “Add” button to add a new main item.
How the System Works
Relationship between the “Cost Sheet,” “Link Quotation To,” and “Client” fields:
- When selecting a bid or project first:
- The “Cost Sheet” list displays only sheets linked to the selected bid or project.
- The “Client” field is automatically filled with the client of the selected project or bid, and becomes disabled.
- When selecting the client first:
- The bid/project and cost sheet dropdowns display only records linked to the same selected client.
- When selecting the cost sheet first:
- The “Client” field is automatically filled with the cost sheet’s client, and becomes disabled.
- If the cost sheet is linked to a bid or project, it’s automatically selected in the “Link Quotation To” field.
- If the cost sheet is linked to both a bid and a project at the same time, the quotation is linked to the project (not the bid).
Editing Restrictions:
- When editing a quotation with “Issued” status, most of its data can be edited, except for the client and the linked bid/project, which become disabled for editing.
Validation Rules
- A “Rejected” quotation: the “Edit” button remains visible, but clicking it displays the message: “You can’t edit a rejected construction quotation, instead you can clone it, or update the cost sheet, then approve it to generate a new construction quotation”.
- An “Approved” quotation: the “Edit” button remains visible, but clicking it displays the message: “You can’t edit an approved construction quotation”.
- A quotation linked to a contract (regardless of its status): the “Edit” button remains visible, but clicking it displays the message: “You can’t edit a contracted construction quotation.”