What do “Autosaving…”, “Autosaved at” and “Autosave failed” mean in construction forms?
They are the autosave status shown in the header of the cost sheet, construction quotation or construction contract form.
- Autosaving…: changes are being sent.
- Autosaved at (time): saved; the time is 12-hour, in the account time zone.
- Autosave failed: the last changes could not be sent; check the connection and save manually before leaving.
- Nothing is shown before the first BoQ row is complete.