Which work item fields are imported into construction quotations and contracts?

In construction quotations and contracts, the import reads these work item fields from the file as they are: Quantity, Unit, Sale Rate, Tax 1 and Tax 2. Their import has no Unit Cost field, so the unit cost is not imported.

  • Their sample file has these columns: Number, Level, Item, Quantity, Unit, Sale Rate, Subtotal, Tax 1, Tax 2, Total. It has no Unit Cost, Cost, Cons./Unit or Profit % columns.
  • The system recalculates the taxes, Subtotal and Total instead of reading them from the file.
  • Accepted levels: Main Tender, Sub-Tender L1 to L3, Work Item. They have no materials, and a row with the Item level is rejected with “Level must be one of: Main Tender, Sub-Tender L1, Sub-Tender L2, Sub-Tender L3, Work Item.”
  • In the cost sheet, the unit cost is read for materials only, and a work item’s cost is calculated from its materials and their consumption.