Creating a Purchase Request from the Construction Contract Work Items

You can create a Purchase Request for the contract materials directly from the Work Items tab. The purchase request form opens with the materials, their quantities and units, linked to the contract’s project. Use it to start the full purchase cycle that goes through approval and then the quotation request.

Required PermissionsManage Purchase Requests + permission to view the contract; the Purchase Cycle app.
How to AccessConstruction → Contracts → open the contract → Work Items tab → Purchase Options → Purchase Request

Steps

  1. Open the contract from Contracts, then the Work Items tab.
  2. Select the materials or work items, then click Purchase Options and choose Purchase Request.
  3. The add purchase request form opens with the Purchase Request Item lines filled.
  4. Enter the Title, review the dates and quantities, then click Save.
  5. The request is saved with the Pending status, and it needs approval before converting it to a Quotation Request.

Form Fields

Field Required Default Accepted Values What It Does
Code Yes The next number in the auto-numbering Number The purchase request number
Title Yes Empty Text The request name; isn’t filled from the contract
Request Date No Today Date The request creation date
Required By No Empty A date equal to or after the request date When you need the materials
Branch Depends on your account The current branch Your branches Appears when branches are enabled
Purchase Request Item (Item, Quantity, unit) Yes, at least one line The selected contract materials An active product; the quantity is a number greater than zero; the product isn’t repeated The required materials
Project (hidden) No The contract’s project — Links the request to the contract’s project
Notes No Empty Text Internal notes
Attachment No — A file up to 5 MB A supporting document

After Saving

  • The request status is Pending, and the Approve and Reject buttons appear.
  • After approval, Convert to Quotation Request appears, and every later document stays linked to the project.
  • No journal entry or inventory transaction is created for the purchase request.
  • Cancelling takes you back to Purchase Requests.

What Is Transferred from the Contract

  • Only materials are transferred, with their planned quantities, units, and conversion factors; services are excluded, and the document is linked to the contract’s project. The full rules are in “Guide to the Purchase Options Button in the Work Items Tab of the Construction Contract”.

Before You Start

  • The Construction app is enabled.
  • The contract has the Active status and is linked to the Cost Sheet that contains the required materials (products of the product type).
  • The supplier is added in advance if the document requires a supplier.
  • You have the document’s permission and the permission to view the contract, and the document’s app is enabled.

Special Cases

  • Selecting materials from two items that use the same material with the same unit produces one line with the total of the two quantities.
  • Selecting the same material with two different units produces two lines; in the purchase request and the quotation request, delete one of them because the product can’t be repeated.
  • The suggested quantity is rounded to the number of decimal places allowed in your account.
  • The system doesn’t keep track of what was purchased before from the contract; each time, the full planned quantity is suggested.
  • The saved selection is valid for 15 minutes for you only.

Why Doesn’t the Button or the Document Appear?

Problem Cause Solution
The Work Items tab doesn’t appear The contract hasn’t been activated yet Activate the contract
The Purchase Options button doesn’t appear The contract isn’t Active, has no Cost Sheet, or you don’t have the permission of any document Open an active contract linked to a cost sheet, and request the permission
The document isn’t in the list You don’t have its permission, or its app isn’t enabled (Purchase Cycle / Inventory) Request the permission from Roles, or enable the app
You are not allowed to access this page appears You don’t have the permission to view the contract Request View All Construction Contracts, or use a contract you created
Some materials are missing They are services or aren’t selected Select the materials

Error Messages and Their Solutions

Message Cause Solution
This is a required field and could not be empty (such as the Title) A required field is empty. Enter the value.
The :attribute field has a duplicate value. (Item) The same product is in two lines, usually because the material was split by unit. Delete one of the two lines, or combine them in one unit.
The :attribute must be a date after or equal to :date. The Required By date is before the Request Date. Choose an equal or later date.
Please Enter a Valid Number / The selected :attribute is invalid. A zero quantity or an unaccepted value. Enter a quantity greater than zero.
The :attribute may not be greater than :max kilobytes. The attachment is larger than 5 MB. Upload a smaller file.

Frequently Asked Questions

Is the title filled automatically?

No; enter it manually because it’s required.

Why did a duplicate value error appear?

Because the material was split into two lines with two units; the purchase request doesn’t accept the product twice.

Is the request linked to the project?

Yes, in a hidden field that takes the contract’s project.

Can I add materials other than the contract materials?

Yes; add lines manually before saving.

What is the allowed attachment size?

Up to 5 MB.

Can I start with the document directly without going through the previous stages?

Yes; every document in Purchase Options can be created directly from the contract, and then you complete the cycle by converting from it.

Are services transferred?

No; services are excluded automatically, and if the selection contains services only, Purchase transactions cannot be created for services. appears.

Do the contract or the cost sheet change after creating the document?

No; the contract’s status, items, and quantities don’t change.

What is the source of the quantity?

The material’s planned quantity in the cost sheet linked to the contract, and it can be edited before saving.