Back

Adding Bill of Materials

A bill of materials is a list that contains the final product to be manufactured, the raw materials used in manufacturing, and the scrap materials resulting from it, in addition to the manufacturing operations (workstations) and the direct expenses related to the manufacturing process. Based on the bill of materials, you can create manufacturing orders, and the manufacturing order takes the same data of the bill with the ability to edit it.

🛈

Before You Start: The final product, the raw materials, and the scrap materials must be added as products in the system to appear in the bill. If they aren’t added, add them first from Add New Product.

Contents

How to Access

  1. Click Manufacturing from the main menu.
  2. Choose Bill of Materials.
  3. Click Add Bill of Materials.
  4. Enter the bill data in the sections explained below.
  5. Click the button Save.

Bill of Material Information

Field Description
Name The name of the bill of materials.
Code A unique number for each bill, generated automatically by the system.
Active Enable it to activate the bill.
Is Default Enable it so that the bill is selected automatically in the manufacturing order after selecting its final product.
Product The final product to be manufactured. If it doesn’t appear, add it first from Add New Product.
Account The account to be assigned to the bill from the Chart of Accounts. You can add a new account to the chart of accounts when needed.
Quantity The quantity to be manufactured of the final product.
Production Routing The production routing assigned to the bill, and the production operations in the rest of the sections are selected from it.

Materials

Field Description
Product The raw material used in manufacturing. It must be added as a product in the system. Click +Add to add another raw material.
QTY The quantity required of the raw material to manufacture the specified quantity of the final product, in the unit of measure specified for the material in the products.
Price Set automatically from the average cost price of the raw material, or from the purchase price if there is no average cost.
Production Operation The stage of the production routing in which the raw material is used.

Expenses

Field Description
Account The account to link the expense to from the Chart of Accounts.
Cost Type The method of calculating the expense when changing the quantity in the manufacturing order. See Cost Types.
Amount The value of the expense for the quantity specified in the bill.
Description An optional description of the expense.
Production Operation The stage of the production routing in which the expense is spent.

Manufacturing Operations

Field Description
Workstation The workstation from the previously added workstations.
Cost Type The method of calculating the operation time when changing the quantity in the manufacturing order. See Cost Types.
Operation Time The operation time in the workstation unit. Example: if the unit is minute and you want an hour, enter 60. And if the unit is hour, enter 1.
Description An optional description of the manufacturing operation.
Production Operation The stage of the production routing specific to the workstation.

Scrap Items

Field Description
Product The product resulting as a scrap item. It must be added as a product in the system.
Quantity The quantity of the scrap item.
Price The price of the scrap item.
Production Operation The stage of the production routing from which the scrap item results.

Cost Types

The difference between the cost types appears when creating a manufacturing order with a quantity different from the quantity in the bill of materials. In expenses, the Amount is adjusted, and in manufacturing operations, the Operation Time is adjusted and the cost changes according to it.

Cost Type Calculation Method Example (quantity in the bill 5, and in the manufacturing order 7)
Fixed Amount The value stays as it is no matter how the quantity changes. An expense of 100 stays 100. An operation time of 50 minutes stays 50 minutes.
Based on QTY The value is distributed over the bill quantity, then multiplied by the manufacturing order quantity. An expense of 100 becomes 140. An operation time of 50 minutes becomes 70 minutes.
Equation The value is calculated by an equation that you can edit. The default equation: (Quantity in the manufacturing order ÷ Quantity in the bill of materials) × Amount for expenses, and × Operation Time for manufacturing operations, and it gives the same result as Based on QTY. With the default equation: (7 ÷ 5) × 100 = 140.

Frequently Asked Questions

The product I want to manufacture or the raw material isn’t in the list, how do I add it?

Add the product first from Inventory → Products & Services → Add New Product, and save it. Then it appears in the products list when adding a bill of materials or a manufacturing order.

Can the same product have more than one bill of materials?

Yes, and only one bill can be made Is Default for each final product, so that it is selected automatically in the manufacturing order.