{"id":23643,"date":"2024-11-18T07:48:19","date_gmt":"2024-11-18T07:48:19","guid":{"rendered":"https:\/\/docs.daftra.com\/tutorial\/%d8%a5%d8%b6%d8%a7%d9%81%d8%a9-%d8%a3%d9%85%d8%b1-%d8%aa%d8%b5%d9%86%d9%8a%d8%b9\/"},"modified":"2026-11-10T10:52:24","modified_gmt":"2026-11-10T10:52:24","slug":"add-manufacturing-order","status":"publish","type":"tutorial","link":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/","title":{"rendered":"Add Manufacturing Order"},"content":{"rendered":"<div dir=\"ltr\" lang=\"en\">\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">A manufacturing order is a document that specifies the finished product to manufacture and its quantity, plus the expected materials, expenses, manufacturing operations, and scrap items, and the cost of each. You can create the manufacturing order manually, or based on a <strong style=\"color: #111827;\">BOM<\/strong> that fills the order\u2019s data automatically. This article explains how to add a manufacturing order, and what happens after you save it.<\/p>\n<div style=\"display: flex; gap: 10px; background: #f6f8fb; border-left: 4px solid #1a56db; border-radius: 6px; padding: 14px 16px; margin: 0 0 18px;\">\n<p><span style=\"flex: 0 0 auto; font-size: 18px; line-height: 1.6;\">\ud83d\udec8<\/span><\/p>\n<p style=\"margin: 0; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Note:<\/strong> The Manufacturing app must be enabled in your account, and the user must have the <strong style=\"color: #111827;\">Add New Manufacturing Order<\/strong> permission. You can review each role\u2019s permissions from <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/owner\/roles\/index\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Roles<\/strong><\/a>.<\/p>\n<\/div>\n<div style=\"border: 1px solid #e5e7eb; border-radius: 8px; padding: 12px 16px; margin: 0 0 20px;\">\n<p style=\"margin: 0 0 6px; font-weight: bold; color: #111827;\">Contents<\/p>\n<ol style=\"margin: 0; padding-left: 22px;\">\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#access\"><strong style=\"color: #1a56db;\">How to access<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#steps\"><strong style=\"color: #1a56db;\">Steps<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#fields\"><strong style=\"color: #1a56db;\">Fields and sections<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#rules\"><strong style=\"color: #1a56db;\">Rules and restrictions<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#errors\"><strong style=\"color: #1a56db;\">Error messages and solutions<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#effect\"><strong style=\"color: #1a56db;\">Effect on the system<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#settings\"><strong style=\"color: #1a56db;\">Statuses and settings that affect it<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#faq\"><strong style=\"color: #1a56db;\">FAQs<\/strong><\/a><\/li>\n<\/ol>\n<\/div>\n<h2 id=\"access\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">How to access<\/h2>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Direct link:<\/strong> <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/manufacturing_order\/create\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Add Manufacturing Order<\/strong><\/a>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">From the menu:<\/strong> Click <strong style=\"color: #111827;\">Manufacturing<\/strong>, then <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/manufacturing_order\/list\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Manufacturing Orders<\/strong><\/a>, then click <strong style=\"color: #111827;\">Add Manufacturing Order<\/strong>.<\/li>\n<\/ul>\n<h2 id=\"steps\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Steps<\/h2>\n<ol style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Open <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/manufacturing_order\/list\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Manufacturing Orders<\/strong><\/a> and click <strong style=\"color: #111827;\">Add Manufacturing Order<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">In the <strong style=\"color: #111827;\">Manufacturing Order Information<\/strong> section, enter the <strong style=\"color: #111827;\">Name<\/strong>, set the <strong style=\"color: #111827;\">Date From<\/strong> and <strong style=\"color: #111827;\">Date To<\/strong>, and choose the <strong style=\"color: #111827;\">Account<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Choose the <strong style=\"color: #111827;\">Employees<\/strong> responsible for the order, and the <strong style=\"color: #111827;\">Client<\/strong> if the order is for a specific client.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Choose the finished product, and enter the <strong style=\"color: #111827;\">Requested Quantity<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">From the <strong style=\"color: #111827;\">BOM<\/strong> field, choose the bill of materials you want to manufacture with. If the product has an active <strong style=\"color: #111827;\">Default<\/strong> BOM, it\u2019s selected automatically once you choose the product, and you can change it to another BOM of the same product.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Choose the <strong style=\"color: #111827;\">Production Routing<\/strong> if you use production stages.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Review the <strong style=\"color: #111827;\">Materials<\/strong>, <strong style=\"color: #111827;\">Expenses<\/strong>, <strong style=\"color: #111827;\">Manufacturing Operations<\/strong>, and <strong style=\"color: #111827;\">Scrap Items<\/strong> sections. If you chose a BOM, these sections are filled automatically, and you can edit them for this order only. If you didn\u2019t choose a BOM, add the rows manually by clicking <strong style=\"color: #111827;\">Add<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Click <strong style=\"color: #111827;\">Save<\/strong>. To save the order and complete it later, click <strong style=\"color: #111827;\">Save as Draft<\/strong>.<\/li>\n<\/ol>\n<div style=\"display: flex; gap: 10px; background: #f6f8fb; border-left: 4px solid #1a56db; border-radius: 6px; padding: 14px 16px; margin: 0 0 18px;\">\n<p><span style=\"flex: 0 0 auto; font-size: 18px; line-height: 1.6;\">\ud83d\udec8<\/span><\/p>\n<p style=\"margin: 0; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Note:<\/strong> If you save the order as a draft, it doesn\u2019t get a final number and no costs are created for it until you open it and click <strong style=\"color: #111827;\">Issue<\/strong>.<\/p>\n<\/div>\n<h2 id=\"fields\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Fields and sections<\/h2>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Manufacturing Order Information<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Description<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Required<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Appears when<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Name<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A name that identifies the manufacturing order.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Code<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The manufacturing order number, generated automatically by the system.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes (automatic)<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Date From<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The manufacturing start date.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Date To<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The expected manufacturing end date.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Account<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The production account in the chart of accounts that the manufacturing order costs are recorded to. It\u2019s copied from the BOM when you choose one.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Employees<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The employees responsible for the manufacturing order. You can choose more than one employee.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Client<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The client the product is manufactured for, if any.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Product<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The finished product you want to manufacture.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Requested Quantity<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The quantity of the finished product to manufacture. When you change it, the material quantities and costs copied from the BOM are recalculated.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">BOM<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The bill of materials that fills the order\u2019s sections. Only the active BOMs of the selected product appear.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/production_routing\/list\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Production Routing<\/strong><\/a><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The production stages that manufacturing goes through. It sets the stage for each row in the following sections.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Materials<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Description<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Required<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Appears when<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Product<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The raw material consumed in manufacturing.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes (at least one row)<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Qty<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The quantity of the raw material needed to manufacture the specified product quantity, in the selected unit of measure.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Price<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The unit price, set automatically from the raw material\u2019s average cost, or from its purchase price if there\u2019s no average cost. It can\u2019t be edited manually.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Production Operation<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The stage in which the raw material is used.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">When a production routing is chosen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div style=\"display: flex; gap: 10px; background: #f6f8fb; border-left: 4px solid #1a56db; border-radius: 6px; padding: 14px 16px; margin: 0 0 18px;\">\n<p><span style=\"flex: 0 0 auto; font-size: 18px; line-height: 1.6;\">\ud83d\udec8<\/span><\/p>\n<p style=\"margin: 0; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Note:<\/strong> You can\u2019t edit the raw material <strong style=\"color: #111827;\">price<\/strong> in a manufacturing order; it\u2019s set automatically from the raw material\u2019s average cost, or from its purchase price if there\u2019s no average cost. The raw materials\u2019 cost in the order changes when the quantity changes. The price of <strong style=\"color: #111827;\">scrap items<\/strong> is entered manually.<\/p>\n<\/div>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Expenses<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Description<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Required<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Appears when<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Account<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The expense account in the chart of accounts.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Estimated Amount<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The expense amount. If the row is copied from the BOM, the amount is calculated based on the <strong style=\"color: #111827;\">Cost Type<\/strong> set in the BOM: <strong style=\"color: #111827;\">Fixed Amount<\/strong> doesn\u2019t change with the quantity, <strong style=\"color: #111827;\">Based on QTY<\/strong> changes in proportion to the requested quantity, and <strong style=\"color: #111827;\">Equation<\/strong> is calculated using the set equation.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Description<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A description of the expense.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Production Operation<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The stage in which the expense is incurred.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">When a production routing is chosen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Manufacturing Operations<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Description<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Required<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Appears when<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/workstation\/list\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Workstation<\/strong><\/a><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The workstation the operation runs on. Its cost is calculated from the workstation cost and the operation time.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Operation Time<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The operating duration in the time unit set on the workstation. Example: if the workstation unit is minutes and you want one hour, enter 60. If the row is copied from the BOM, the time changes based on the <strong style=\"color: #111827;\">Cost Type<\/strong>.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Description<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A description of the operation.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Production Operation<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The stage in which the operation takes place.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">When a production routing is chosen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Scrap Items<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Description<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Required<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Appears when<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Product<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The product that results as scrap or a by-product of manufacturing.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Qty<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The scrap item quantity.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Price<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The unit value of the scrap item, entered manually. The value of scrap items is deducted from the order cost.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Always<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Production Operation<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The stage in which the scrap item results.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">When a production routing is chosen<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"rules\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Rules and restrictions<\/h2>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">You must add at least one row in <strong style=\"color: #111827;\">Materials<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Raw materials and scrap items must be active products, not services.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The <strong style=\"color: #111827;\">BOM<\/strong> field shows only the active BOMs of the selected product.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The raw material price is set automatically and can\u2019t be edited, while the scrap item price is entered manually.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Editing a manufacturing order doesn\u2019t change the original BOM, and editing the BOM later doesn\u2019t change existing manufacturing orders.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">When you change the <strong style=\"color: #111827;\">Requested Quantity<\/strong>, the raw material and scrap item quantities change in proportion to the new quantity against the BOM quantity, and expenses and manufacturing operations change based on the <strong style=\"color: #111827;\">Cost Type<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">You can\u2019t change the <strong style=\"color: #111827;\">Account<\/strong> after a stock request or permission is created for the order\u2019s raw materials.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">All costs are in the account\u2019s main currency.<\/li>\n<\/ul>\n<h2 id=\"errors\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Error messages and solutions<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Cause<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Message<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Solution<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No raw material was added.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">You should add one Row at least in Materials<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Add at least one raw material in the <strong style=\"color: #111827;\">Materials<\/strong> section.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The user doesn\u2019t have permission to add manufacturing orders.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">You are not allowed to access this page<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Ask the account owner to add the <strong style=\"color: #111827;\">Add New Manufacturing Order<\/strong> permission to your role from <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/owner\/roles\/index\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Roles<\/strong><\/a>.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"effect\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Effect on the system<\/h2>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">On saving, the order gets an automatic number and its status becomes <strong style=\"color: #111827;\">In Progress<\/strong>. When saved as a draft, its status is <strong style=\"color: #111827;\">Draft<\/strong> until you click <strong style=\"color: #111827;\">Issue<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Saving a manufacturing order doesn\u2019t deduct raw materials from stock or add the finished product. Raw materials are deducted when they\u2019re issued from the order page through <strong style=\"color: #111827;\">Receive Materials<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">When you click <strong style=\"color: #111827;\">Finish Manufacturing Order<\/strong>, the finished product and scrap item quantities are added to stock, the production journal entries are recorded, and the order status becomes <strong style=\"color: #111827;\">Finished<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Creating the order is recorded in the activity log.<\/li>\n<\/ul>\n<h2 id=\"settings\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Statuses and settings that affect it<\/h2>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Default BOM:<\/strong> If one of the product\u2019s <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/bom\/list\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Bills of Materials<\/strong><\/a> is set as <strong style=\"color: #111827;\">Default<\/strong> and active, it\u2019s selected automatically when you choose the product. Only one default BOM can be set per product.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">BOM status:<\/strong> <strong style=\"color: #111827;\">Inactive<\/strong> BOMs don\u2019t appear in the manufacturing order.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Production routing:<\/strong> The <strong style=\"color: #111827;\">Production Operation<\/strong> field appears in the sections when a production routing is chosen.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Branches:<\/strong> When branches are enabled, only the current branch\u2019s BOMs appear.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Closed financial periods:<\/strong> They prevent finishing a manufacturing order, or undoing its completion, within a closed period.<\/li>\n<\/ul>\n<h2 id=\"faq\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">FAQs<\/h2>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Can I edit the raw materials price when creating a manufacturing order?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">No, you can\u2019t edit the raw material price in a manufacturing order. The price is set automatically from the raw material\u2019s average cost, or from its purchase price if there\u2019s no average cost. The raw materials\u2019 cost in the order changes when the quantity changes. For scrap items, you can enter the price manually.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Can I have a variable bill of materials for the same product, so I use a different BOM or edit the BOM with each manufacturing order?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Yes. You don\u2019t have to use one fixed bill of materials per product; you can choose the right BOM with each manufacturing order in two ways:<\/p>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">1. More than one BOM for the same product:<\/strong> for recurring compositions.<\/p>\n<ol style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Create a separate bill of materials for each composition you use for the product, such as a BOM with different raw materials or different quantities.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Set the most used BOM as <strong style=\"color: #111827;\">Default<\/strong>, so it\u2019s selected automatically when you choose the product in the manufacturing order.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">When creating the manufacturing order, choose the product, then choose the BOM you want for this order from the <strong style=\"color: #111827;\">BOM<\/strong> field.<\/li>\n<\/ol>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">2. Editing inside the manufacturing order:<\/strong> for one-time changes.<\/p>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">After choosing the BOM, edit the raw materials, quantities, expenses, or manufacturing operations inside the manufacturing order itself.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">This edit applies to this order only, and doesn\u2019t change the original BOM.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Notes:<\/strong><\/p>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The <strong style=\"color: #111827;\">BOM<\/strong> field shows only the active BOMs of the selected product.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Only one default BOM can be set per product.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Editing the BOM later doesn\u2019t change manufacturing orders created before.<\/li>\n<\/ul>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Why doesn\u2019t the BOM appear in the manufacturing order?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Only the active BOMs of the selected product appear. Make sure the BOM is for the same product, its status is <strong style=\"color: #111827;\">Active<\/strong>, and it belongs to the current branch if branches are enabled.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Can I create a manufacturing order without a BOM?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Yes. Leave the <strong style=\"color: #111827;\">BOM<\/strong> field empty, and add the raw materials, expenses, manufacturing operations, and scrap items manually.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">If I edit the BOM, do previous manufacturing orders change?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">No. A manufacturing order keeps a copy of the BOM data at the time it was created, and editing the BOM affects only new manufacturing orders.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">When are raw materials deducted from stock?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">They aren\u2019t deducted when the manufacturing order is saved. They\u2019re deducted when issued from the order page through <strong style=\"color: #111827;\">Receive Materials<\/strong>. The finished product is added to stock when you click <strong style=\"color: #111827;\">Finish Manufacturing Order<\/strong>.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">I saved the manufacturing order as a draft. How do I start manufacturing?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Open the manufacturing order and click <strong style=\"color: #111827;\">Issue<\/strong>. The order gets its final number and its status becomes <strong style=\"color: #111827;\">In Progress<\/strong>.<\/p>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"author":13,"featured_media":0,"template":"","categories":[2177,7328,7262],"tags":[7344,7267,7333,7345],"class_list":["post-23643","tutorial","type-tutorial","status-publish","hentry","category-inventory","category-manufacturing-orders","category-manufacturing","tag-creating-manufacturing-order-en","tag-manufacturing","tag-manufacturing-order","tag-what-is-a-manufacturing-order-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Add Manufacturing Order - Daftra Knowledge Base<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Add Manufacturing Order - Daftra Knowledge Base\" \/>\n<meta property=\"og:description\" content=\"A manufacturing order is a document that specifies the finished product to manufacture and its quantity, plus the expected materials, expenses, manufacturing operations, and scrap items, and the cost of each. You can create the manufacturing order manually, or based on a BOM that fills the order\u2019s data automatically. This article explains how to add [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/\" \/>\n<meta property=\"og:site_name\" content=\"Daftra Knowledge Base\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-10T10:52:24+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/docs.daftra.com\/en\/#organization\",\"name\":\"Daftra\",\"url\":\"https:\/\/docs.daftra.com\/en\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/docs.daftra.com\/en\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"contentUrl\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"caption\":\"Daftra\"},\"image\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/docs.daftra.com\/en\/#website\",\"url\":\"https:\/\/docs.daftra.com\/en\/\",\"name\":\"Daftra Knowledge Base\",\"description\":\"Daftra\",\"publisher\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/docs.daftra.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#webpage\",\"url\":\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/\",\"name\":\"Add Manufacturing Order - Daftra Knowledge Base\",\"isPartOf\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/#website\"},\"datePublished\":\"2024-11-18T07:48:19+00:00\",\"dateModified\":\"2026-11-10T10:52:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/docs.daftra.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Add Manufacturing Order\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Add Manufacturing Order - Daftra Knowledge Base","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/","og_locale":"en_US","og_type":"article","og_title":"Add Manufacturing Order - Daftra Knowledge Base","og_description":"A manufacturing order is a document that specifies the finished product to manufacture and its quantity, plus the expected materials, expenses, manufacturing operations, and scrap items, and the cost of each. You can create the manufacturing order manually, or based on a BOM that fills the order\u2019s data automatically. This article explains how to add [&hellip;]","og_url":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/","og_site_name":"Daftra Knowledge Base","article_modified_time":"2026-11-10T10:52:24+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/docs.daftra.com\/en\/#organization","name":"Daftra","url":"https:\/\/docs.daftra.com\/en\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/docs.daftra.com\/en\/#logo","inLanguage":"en-US","url":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","contentUrl":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","caption":"Daftra"},"image":{"@id":"https:\/\/docs.daftra.com\/en\/#logo"}},{"@type":"WebSite","@id":"https:\/\/docs.daftra.com\/en\/#website","url":"https:\/\/docs.daftra.com\/en\/","name":"Daftra Knowledge Base","description":"Daftra","publisher":{"@id":"https:\/\/docs.daftra.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/docs.daftra.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#webpage","url":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/","name":"Add Manufacturing Order - Daftra Knowledge Base","isPartOf":{"@id":"https:\/\/docs.daftra.com\/en\/#website"},"datePublished":"2024-11-18T07:48:19+00:00","dateModified":"2026-11-10T10:52:24+00:00","breadcrumb":{"@id":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/add-manufacturing-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/docs.daftra.com\/en\/"},{"@type":"ListItem","position":2,"name":"Add Manufacturing Order"}]}]}},"_links":{"self":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/23643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial"}],"about":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/types\/tutorial"}],"author":[{"embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/users\/13"}],"version-history":[{"count":5,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/23643\/revisions"}],"predecessor-version":[{"id":157903,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/23643\/revisions\/157903"}],"wp:attachment":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/media?parent=23643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/categories?post=23643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tags?post=23643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}