{"id":158176,"date":"2026-10-26T10:01:48","date_gmt":"2026-10-26T10:01:48","guid":{"rendered":"https:\/\/docs.daftra.com\/tutorial\/construction-contract-statuses-change-them\/"},"modified":"2026-11-11T14:09:55","modified_gmt":"2026-11-11T14:09:55","slug":"construction-contract-statuses-change-them","status":"publish","type":"tutorial","link":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/","title":{"rendered":"Construction Contract Statuses and How to Change Them"},"content":{"rendered":"<div dir=\"ltr\" lang=\"en\">\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">A Construction contract goes through several statuses from the time you create it until you close it, and each status determines what you can do with the contract: edit it, delete it, and add Payment Certificates. This guide explains the statuses and how to move between them using the buttons in the contract header, including <strong style=\"color: #111827;\">Close<\/strong>.<\/p>\n<div style=\"background: #f6f8fb; border: 1px solid #e5e7eb; border-radius: 8px; padding: 12px 16px; margin: 0 0 20px; font-size: 15px; line-height: 1.8;\">\n<div style=\"display: flex; gap: 8px; padding: 4px 0;\"><span style=\"min-width: 120px; color: #6b7280;\">Required permissions<\/span><span style=\"color: #1f2430;\"><strong style=\"color: #111827;\">Issue<\/strong> and <strong style=\"color: #111827;\">Set as Draft<\/strong>: <strong style=\"color: #111827;\">Edit and delete all Construction contracts<\/strong> or <strong style=\"color: #111827;\">Edit and delete your own Construction contracts<\/strong>. <strong style=\"color: #111827;\">Activate<\/strong>, <strong style=\"color: #111827;\">Reactivate<\/strong>, and <strong style=\"color: #111827;\">Cancel<\/strong>: <strong style=\"color: #111827;\">Approve and reject Construction contracts<\/strong>. <strong style=\"color: #111827;\">Close<\/strong>: <strong style=\"color: #111827;\">Approve and reject Construction contracts<\/strong> along with the permission to edit Contracts.<\/span><\/div>\n<div style=\"display: flex; gap: 8px; padding: 4px 0;\"><span style=\"min-width: 120px; color: #6b7280;\">How to access<\/span><span style=\"color: #1f2430;\">Direct link: <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/construction_contract\/list?reset=1\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Contracts<\/strong><\/a>. Or from the main menu: <strong style=\"color: #111827;\">Construction<\/strong> &gt; <strong style=\"color: #111827;\">Contracts<\/strong> &gt; open the contract. The status change buttons appear at the top left of the contract page.<\/span><\/div>\n<\/div>\n<div style=\"border: 1px solid #e5e7eb; border-radius: 8px; padding: 12px 16px; margin: 0 0 20px;\">\n<p style=\"margin: 0 0 6px; font-weight: bold; color: #111827;\">Table of Contents<\/p>\n<ol style=\"margin: 0; padding-left: 22px;\">\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#list\"><strong style=\"color: #1a56db;\">Contract Statuses<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#flow\"><strong style=\"color: #1a56db;\">Moving Between Statuses<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#activate\"><strong style=\"color: #1a56db;\">Activating a Contract<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#close\"><strong style=\"color: #1a56db;\">Closing a Contract<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#reactivate\"><strong style=\"color: #1a56db;\">Reactivating a Contract<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#draft\"><strong style=\"color: #1a56db;\">Issuing and Setting as Draft<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#allow\"><strong style=\"color: #1a56db;\">What Each Status Allows<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#errors\"><strong style=\"color: #1a56db;\">Error Messages and Solutions<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#faq\"><strong style=\"color: #1a56db;\">Frequently Asked Questions<\/strong><\/a><\/li>\n<\/ol>\n<\/div>\n<h2 id=\"list\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Contract Statuses<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Status<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Meaning<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Draft<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A contract that is saved provisionally and has a temporary number.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Issued<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A completed contract that is not yet activated. This is the default status when you save.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Active<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A contract that is in progress; you can add Payment Certificates to it.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Closed<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A contract that is completed and delivered.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Canceled<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A contract that was terminated before it was completed.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"flow\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Moving Between Statuses<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Current Status<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Buttons in the Contract Header<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">New Status<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Draft<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Issue<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Issued<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Issued<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Activate<\/strong> \/ <strong style=\"color: #111827;\">Set as Draft<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Active<\/strong> \/ <strong style=\"color: #111827;\">Draft<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Active<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Close<\/strong> \/ <strong style=\"color: #111827;\">Cancel<\/strong> (in the action bar)<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Closed<\/strong> \/ <strong style=\"color: #111827;\">Canceled<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Closed<\/strong> \/ <strong style=\"color: #111827;\">Canceled<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Reactivate<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Active<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Each action requires confirmation in the <strong style=\"color: #111827;\">Change Status<\/strong> window, with the <strong style=\"color: #111827;\">Yes<\/strong> and <strong style=\"color: #111827;\">No<\/strong> buttons.<\/p>\n<h2 id=\"activate\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Activate a Contract<\/h2>\n<ol style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Open the issued contract and click <strong style=\"color: #111827;\">Activate<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">A message appears: <strong style=\"color: #111827;\">Are you sure you want to activate contract #(number)? Once activated, it cannot be returned to draft.<\/strong><\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Click <strong style=\"color: #111827;\">Yes<\/strong>; the message <strong style=\"color: #111827;\">Contract #(number) was activated successfully<\/strong> appears.<\/li>\n<\/ol>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The contract must be linked to a project.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">After the first activation, the contract&#8217;s financial data is locked (currency, quotation, performance guarantee, advance payment, recovery plan, and taxes).<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Cost Centers are created for the contract under the project according to the cost tracking level, and the Work Items tab appears.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">You cannot delete a contract after it is activated.<\/li>\n<\/ul>\n<h2 id=\"close\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Close a Contract<\/h2>\n<ol style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Open the active contract and click <strong style=\"color: #111827;\">Close<\/strong>.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">A message appears: <strong style=\"color: #111827;\">Are you sure you want to close contract #(number)? This will mark the contract as delivered and completed.<\/strong><\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Click <strong style=\"color: #111827;\">Yes<\/strong>; the status changes to <strong style=\"color: #111827;\">Closed<\/strong>.<\/li>\n<\/ol>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The project status changes to Completed if the completion percentage of the work items is 100% or more.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">You cannot edit or delete a closed contract, or add progress billings to it.<\/li>\n<\/ul>\n<h2 id=\"reactivate\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Reactivate a Contract<\/h2>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">From a closed or canceled contract, click <strong style=\"color: #111827;\">Reactivate<\/strong> and then <strong style=\"color: #111827;\">Yes<\/strong>, and the contract returns to <strong style=\"color: #111827;\">Active<\/strong>. The project status does not automatically revert.<\/p>\n<h2 id=\"draft\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Issue and Set as Draft<\/h2>\n<ul style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Issue<\/strong>: Changes the draft to <strong style=\"color: #111827;\">Issued<\/strong>, and the contract receives a number from the Contracts numbering sequence.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Set as Draft<\/strong>: Returns the issued contract to a draft with a temporary number. You cannot return an active contract to a draft.<\/li>\n<\/ul>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">For cancellation, see the guide on canceling a Construction contract.<\/p>\n<h2 id=\"allow\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">What Each Status Allows<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Status<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Edit<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Delete<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Progress Billings and Invoices<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Advance Payments<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Draft<\/strong> \/ <strong style=\"color: #111827;\">Issued<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Active<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes (except financial data)<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Closed<\/strong> \/ <strong style=\"color: #111827;\">Canceled<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">No<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Yes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"errors\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Error Messages and Solutions<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Message That Appears<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Cause<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Solution<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Contract #(number) cannot be activated because it is not linked to a project.<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The contract has no project.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Link the contract to a project from <strong style=\"color: #111827;\">Edit<\/strong>.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Failed to update the status<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The status could not be changed, usually because you don&#8217;t have the required permission.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Check your permissions.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Contract #(number) cannot be updated because it is closed \/ canceled<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">You tried to edit a closed or canceled contract.<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Reactivate it.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"faq\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Frequently Asked Questions<\/h2>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Can an active contract be returned to draft?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">No. After activation, you can only close or cancel it.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">What is the difference between closing and canceling?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Closing is for a contract that is completed and delivered, while canceling ends a contract before it is completed. Both can be reversed by reactivating the contract.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Why doesn&#8217;t the Close button appear?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Either the contract is not active, or you don&#8217;t have the <strong style=\"color: #111827;\">Approve and Reject Construction Contracts<\/strong> permission along with the permission to edit contracts.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Does closing a contract create journal entries?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">No. Changing the contract status does not create accounting entries.<\/p>\n<\/div>\n","protected":false},"author":38,"featured_media":0,"template":"","categories":[15599,16736],"tags":[30234,28496,30212,30236,30231,30167,30235,30232,3911,30229,30237,30230,30233],"class_list":["post-158176","tutorial","type-tutorial","status-publish","hentry","category-construction","category-contracts-construction","tag-activate-contract","tag-active-contract","tag-canceled-contract","tag-cannot-activate-a-contract-not-linked-to-a-project","tag-close-contract","tag-closed-contract","tag-construction-contract-statuses","tag-difference-between-closing-and-canceling","tag-draft","tag-issue-contract","tag-issued","tag-reactivation","tag-set-as-draft"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction Contract Statuses and How to Change Them - Daftra Knowledge Base<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Contract Statuses and How to Change Them - Daftra Knowledge Base\" \/>\n<meta property=\"og:description\" content=\"A Construction contract goes through several statuses from the time you create it until you close it, and each status determines what you can do with the contract: edit it, delete it, and add Payment Certificates. This guide explains the statuses and how to move between them using the buttons in the contract header, including [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/\" \/>\n<meta property=\"og:site_name\" content=\"Daftra Knowledge Base\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-11T14:09:55+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/docs.daftra.com\/#organization\",\"name\":\"Daftra\",\"url\":\"https:\/\/docs.daftra.com\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/docs.daftra.com\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"contentUrl\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"caption\":\"Daftra\"},\"image\":{\"@id\":\"https:\/\/docs.daftra.com\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/docs.daftra.com\/#website\",\"url\":\"https:\/\/docs.daftra.com\/\",\"name\":\"Daftra Knowledge Base\",\"description\":\"Daftra\",\"publisher\":{\"@id\":\"https:\/\/docs.daftra.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/docs.daftra.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#webpage\",\"url\":\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/\",\"name\":\"Construction Contract Statuses and How to Change Them - Daftra Knowledge Base\",\"isPartOf\":{\"@id\":\"https:\/\/docs.daftra.com\/#website\"},\"datePublished\":\"2026-10-26T10:01:48+00:00\",\"dateModified\":\"2026-11-11T14:09:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/docs.daftra.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction Contract Statuses and How to Change Them\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Contract Statuses and How to Change Them - Daftra Knowledge Base","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/","og_locale":"en_US","og_type":"article","og_title":"Construction Contract Statuses and How to Change Them - Daftra Knowledge Base","og_description":"A Construction contract goes through several statuses from the time you create it until you close it, and each status determines what you can do with the contract: edit it, delete it, and add Payment Certificates. This guide explains the statuses and how to move between them using the buttons in the contract header, including [&hellip;]","og_url":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/","og_site_name":"Daftra Knowledge Base","article_modified_time":"2026-11-11T14:09:55+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/docs.daftra.com\/#organization","name":"Daftra","url":"https:\/\/docs.daftra.com\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/docs.daftra.com\/#logo","inLanguage":"en-US","url":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","contentUrl":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","caption":"Daftra"},"image":{"@id":"https:\/\/docs.daftra.com\/#logo"}},{"@type":"WebSite","@id":"https:\/\/docs.daftra.com\/#website","url":"https:\/\/docs.daftra.com\/","name":"Daftra Knowledge Base","description":"Daftra","publisher":{"@id":"https:\/\/docs.daftra.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/docs.daftra.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#webpage","url":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/","name":"Construction Contract Statuses and How to Change Them - Daftra Knowledge Base","isPartOf":{"@id":"https:\/\/docs.daftra.com\/#website"},"datePublished":"2026-10-26T10:01:48+00:00","dateModified":"2026-11-11T14:09:55+00:00","breadcrumb":{"@id":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/construction-contract-statuses-change-them\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/docs.daftra.com\/en\/"},{"@type":"ListItem","position":2,"name":"Construction Contract Statuses and How to Change Them"}]}]}},"_links":{"self":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/158176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial"}],"about":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/types\/tutorial"}],"author":[{"embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/users\/38"}],"version-history":[{"count":2,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/158176\/revisions"}],"predecessor-version":[{"id":158179,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/158176\/revisions\/158179"}],"wp:attachment":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/media?parent=158176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/categories?post=158176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tags?post=158176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}