{"id":156216,"date":"2026-11-04T13:58:55","date_gmt":"2026-11-04T13:58:55","guid":{"rendered":"https:\/\/docs.daftra.com\/?post_type=tutorial&#038;p=156216"},"modified":"2026-11-04T14:07:03","modified_gmt":"2026-11-04T14:07:03","slug":"creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations","status":"publish","type":"tutorial","link":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/","title":{"rendered":"Creating a Quotation from a Cost Sheet and Tracking Its Quotations"},"content":{"rendered":"<div dir=\"ltr\" lang=\"en\">\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">You can create a construction quotation directly from the <strong style=\"color: #111827;\">Cost Sheet<\/strong> page with its data ready, track all quotations linked to it from a dedicated tab, and see their operations in the cost sheet&#8217;s activity log.<\/p>\n<div style=\"border: 1px solid #e5e7eb; border-radius: 8px; padding: 12px 16px; margin: 0 0 20px;\">\n<p style=\"margin: 0 0 6px; font-weight: bold; color: #111827;\">Contents<\/p>\n<ol style=\"margin: 0; padding-left: 22px;\">\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#create\"><strong style=\"color: #1a56db;\">Creating a quotation from a cost sheet<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#prefill\"><strong style=\"color: #1a56db;\">Fields filled automatically<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#tab\"><strong style=\"color: #1a56db;\">Construction Quotations tab<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#log\"><strong style=\"color: #1a56db;\">Activity log<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#approve\"><strong style=\"color: #1a56db;\">Approving the cost sheet and the quotation<\/strong><\/a><\/li>\n<li style=\"margin-bottom: 4px;\"><a style=\"color: #1a56db;\" href=\"#faq\"><strong style=\"color: #1a56db;\">FAQs<\/strong><\/a><\/li>\n<\/ol>\n<\/div>\n<h2 id=\"create\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Creating a quotation from a cost sheet<\/h2>\n<ol style=\"margin: 0 0 16px; padding-left: 26px;\">\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">From the main menu, choose <strong style=\"color: #111827;\">Construction<\/strong>, then <a style=\"color: #1a56db;\" href=\"https:\/\/go.daftra.com\/v2\/owner\/entity\/construction_cost_sheet\/list?reset=1\" target=\"_blank\" rel=\"noopener\"><strong style=\"color: #1a56db;\">Cost Sheets<\/strong><\/a>, and open the cost sheet.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Click <strong style=\"color: #111827;\">Create Construction Quotation<\/strong> in the action bar.<\/li>\n<li style=\"margin-bottom: 10px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The quotation form opens with its data filled in from the cost sheet. Review and edit it if needed, then save.<\/li>\n<\/ol>\n<div style=\"display: flex; gap: 10px; background: #f6f8fb; border-left: 4px solid #1a56db; border-radius: 6px; padding: 14px 16px; margin: 0 0 18px;\">\n<span style=\"flex: 0 0 auto; font-size: 18px; line-height: 1.6;\">\ud83d\udec8<\/span><\/p>\n<p style=\"margin: 0; line-height: 1.9; font-size: 16px; color: #1f2430;\"><strong style=\"color: #111827;\">Note:<\/strong> The <strong style=\"color: #111827;\">Create Construction Quotation<\/strong> button doesn&#8217;t appear for a cost sheet with the <strong style=\"color: #111827;\">Contracted<\/strong> or <strong style=\"color: #111827;\">Rejected<\/strong> status, and it requires permission to add quotations.<\/p>\n<\/div>\n<h2 id=\"prefill\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Fields filled automatically<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Field<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Source<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Cost sheet<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The cost sheet you created the quotation from.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Project or bid<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The project or bid linked to the cost sheet.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Client<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The client of the project or bid, or the cost sheet&#8217;s client if it isn&#8217;t linked to either.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Duration and dates<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The cost sheet&#8217;s duration and start and end dates.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Taxes and currency<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The cost sheet&#8217;s taxes and currency.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Bill of Quantities<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The cost sheet&#8217;s items.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"tab\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Construction Quotations tab<\/h2>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">The <strong style=\"color: #111827;\">Construction Quotations (count)<\/strong> tab appears between <strong style=\"color: #111827;\">Details<\/strong> and <strong style=\"color: #111827;\">Activity Log<\/strong> if the cost sheet has at least one quotation and you have permission to view quotations. It shows the following columns:<\/p>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Column<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">What it shows<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Construction Quotation No.<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The quotation number.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Client<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The client&#8217;s image, name, and number.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Price<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The quotation total.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Created By<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The employee&#8217;s image, name, number, and the creation date.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Status<\/strong><\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\"><strong style=\"color: #111827;\">Issued<\/strong>, <strong style=\"color: #111827;\">Approved<\/strong>, <strong style=\"color: #111827;\">Contracted<\/strong>, or <strong style=\"color: #111827;\">Rejected<\/strong>.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Click any row to open the quotation, or use the row&#8217;s actions menu: <strong style=\"color: #111827;\">View<\/strong>, <strong style=\"color: #111827;\">Edit<\/strong>, <strong style=\"color: #111827;\">Clone<\/strong>, or <strong style=\"color: #111827;\">Delete<\/strong>.<\/p>\n<h2 id=\"log\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Activity log<\/h2>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Operations on quotations linked to the cost sheet, such as creating, editing, and changing the status, also appear in the cost sheet&#8217;s <strong style=\"color: #111827;\">Activity Log<\/strong> tab.<\/p>\n<h2 id=\"approve\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">Approving the cost sheet and the quotation<\/h2>\n<table style=\"width: 100%; border-collapse: collapse; margin: 0 0 18px;\">\n<tbody>\n<tr>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">Operation<\/th>\n<th style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; background: #f6f8fb; font-weight: bold;\">What happens<\/th>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Approving a cost sheet that has no quotation<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">A new quotation is created with the <strong style=\"color: #111827;\">Issued<\/strong> status, and the confirmation message says so.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Approving a cost sheet that has a quotation<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The latest quotation linked to it (unless rejected) is updated with the cost sheet changes, and the confirmation message mentions its number.<\/td>\n<\/tr>\n<tr>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">Approving a quotation linked to a cost sheet<\/td>\n<td style=\"border: 1px solid #e5e7eb; padding: 10px 12px; text-align: left; vertical-align: top;\">The cost sheet is updated with the quotation&#8217;s Bill of Quantities, duration, dates, and taxes.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 id=\"faq\" style=\"font-size: 22px; font-weight: bold; color: #111827; margin: 32px 0 14px; padding-bottom: 8px; border-bottom: 2px solid #eef0f3;\">FAQs<\/h2>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Why doesn&#8217;t the Construction Quotations tab appear?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Because no quotation is linked to the cost sheet yet, or because you don&#8217;t have permission to view quotations.<\/p>\n<h3 style=\"font-size: 18px; font-weight: bold; color: #111827; margin: 24px 0 10px;\">Can I create more than one quotation from the same cost sheet?<\/h3>\n<p style=\"margin: 0 0 14px; line-height: 1.9; font-size: 16px; color: #1f2430;\">Yes, as long as the cost sheet isn&#8217;t <strong style=\"color: #111827;\">Contracted<\/strong> or <strong style=\"color: #111827;\">Rejected<\/strong>. All quotations appear in the tab.<\/p>\n<\/div>\n","protected":false},"author":39,"featured_media":0,"template":"","categories":[15599,16075,16356],"tags":[28535,15726,28716,28719,15689,16747,28715,16579,16379,28714,28717,16545,28718],"class_list":["post-156216","tutorial","type-tutorial","status-publish","hentry","category-construction","category-quotations","category-cost-sheets","tag-approve-cost-sheet","tag-bill-of-quantities","tag-boq","tag-can-i-create-more-than-one-quotation-from-the-same-cost-sheet","tag-construction","tag-construction-quotation","tag-construction-quotations-tab","tag-cost-sheet","tag-cost-sheet-activity-log","tag-create-quotation-from-cost-sheet","tag-how-do-i-create-a-construction-quotation-from-a-cost-sheet","tag-link-quotation-to-cost-sheet","tag-why-doesnt-the-create-construction-quotation-button-appear"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v17.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base<\/title>\n<meta name=\"description\" content=\"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base\" \/>\n<meta property=\"og:description\" content=\"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/\" \/>\n<meta property=\"og:site_name\" content=\"Daftra Knowledge Base\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-04T14:07:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Organization\",\"@id\":\"https:\/\/docs.daftra.com\/#organization\",\"name\":\"Daftra\",\"url\":\"https:\/\/docs.daftra.com\/\",\"sameAs\":[],\"logo\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/docs.daftra.com\/#logo\",\"inLanguage\":\"en-US\",\"url\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"contentUrl\":\"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg\",\"caption\":\"Daftra\"},\"image\":{\"@id\":\"https:\/\/docs.daftra.com\/#logo\"}},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/docs.daftra.com\/#website\",\"url\":\"https:\/\/docs.daftra.com\/\",\"name\":\"Daftra Knowledge Base\",\"description\":\"Daftra\",\"publisher\":{\"@id\":\"https:\/\/docs.daftra.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/docs.daftra.com\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#webpage\",\"url\":\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/\",\"name\":\"Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base\",\"isPartOf\":{\"@id\":\"https:\/\/docs.daftra.com\/#website\"},\"datePublished\":\"2026-11-04T13:58:55+00:00\",\"dateModified\":\"2026-11-04T14:07:03+00:00\",\"description\":\"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.\",\"breadcrumb\":{\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/docs.daftra.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Creating a Quotation from a Cost Sheet and Tracking Its Quotations\"}]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base","description":"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/","og_locale":"en_US","og_type":"article","og_title":"Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base","og_description":"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.","og_url":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/","og_site_name":"Daftra Knowledge Base","article_modified_time":"2026-11-04T14:07:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Organization","@id":"https:\/\/docs.daftra.com\/#organization","name":"Daftra","url":"https:\/\/docs.daftra.com\/","sameAs":[],"logo":{"@type":"ImageObject","@id":"https:\/\/docs.daftra.com\/#logo","inLanguage":"en-US","url":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","contentUrl":"https:\/\/docs.daftra.com\/wp-content\/uploads\/2023\/10\/daftra-ar.svg","caption":"Daftra"},"image":{"@id":"https:\/\/docs.daftra.com\/#logo"}},{"@type":"WebSite","@id":"https:\/\/docs.daftra.com\/#website","url":"https:\/\/docs.daftra.com\/","name":"Daftra Knowledge Base","description":"Daftra","publisher":{"@id":"https:\/\/docs.daftra.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/docs.daftra.com\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#webpage","url":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/","name":"Creating a Quotation from a Cost Sheet and Tracking Its Quotations - Daftra Knowledge Base","isPartOf":{"@id":"https:\/\/docs.daftra.com\/#website"},"datePublished":"2026-11-04T13:58:55+00:00","dateModified":"2026-11-04T14:07:03+00:00","description":"Create a construction quotation from a cost sheet with its data ready, and track the linked quotations and their activity from the cost sheet page.","breadcrumb":{"@id":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/docs.daftra.com\/en\/tutorial\/creating-a-quotation-from-a-cost-sheet-and-tracking-its-quotations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/docs.daftra.com\/en\/"},{"@type":"ListItem","position":2,"name":"Creating a Quotation from a Cost Sheet and Tracking Its Quotations"}]}]}},"_links":{"self":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/156216","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial"}],"about":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/types\/tutorial"}],"author":[{"embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/users\/39"}],"version-history":[{"count":4,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/156216\/revisions"}],"predecessor-version":[{"id":156428,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tutorial\/156216\/revisions\/156428"}],"wp:attachment":[{"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/media?parent=156216"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/categories?post=156216"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/docs.daftra.com\/en\/wp-json\/wp\/v2\/tags?post=156216"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}